IPO Connectivity

Who/Where: 
IPO
When: 
Wednesday, March 5, 2014 - 14:00
Why: 
Unfinished structured cabling
Account: 

Aside from the Post Grad problem to which the Damian Hall is connected, the new office of IPO also has a structured cabling problem. The Intermediate Distribution Frame (IDF) located to the soon to be office of BAC is not yet polished. Aside from the disorganized cabling provided by the contractor (c/o CPDMO), the patch panel inside the IDF is also not yet arranged. Together with Jet of IPO, we were about to place a new HP manageable switch to the IDF but upon seeing its condition we opted not to. The IDF should be fixed first before the IMS proceed to install the switch.